CLC number: TP273; TP183
On-line Access: 2018-09-04
Received: 2016-07-06
Revision Accepted: 2016-09-19
Crosschecked: 2018-07-08
Cited: 0
Clicked: 7065
Zai-sheng Pan, Xuan-hao Zhou, Peng Chen. Development and application of a neural network based coating weight control system for a hot-dip galvanizing line[J]. Frontiers of Information Technology & Electronic Engineering,in press.https://doi.org/10.1631/FITEE.1601397 @article{title="Development and application of a neural network based coating weight control system for a hot-dip galvanizing line", %0 Journal Article TY - JOUR
基于神经网络的热镀锌层厚控制系统的研究与应用关键词组: Darkslateblue:Affiliate; Royal Blue:Author; Turquoise:Article
Reference[1]Adams J, Miles LB, Parker DJ, et al., 1996. Coating mass control on No. 2 galvanizing line at LTV steel’s Indiana Harbor works. Iron Steel Eng, 73(1):123-131. [2]Bloch G, Sirou F, Eustache V, et al., 1997. Neural intelligent control for a steel plant. IEEE Trans Neur Netw, 8(4): 910-918. [3]Elsaadawy EA, Hanumanth GS, Balthazaar AKS, et al., 2007. Coating weight model for the continuous hot-dip galvanizing process. Metall Mater Trans B, 38(3):413-424. [4]Fei J, Zhang Y, Wang JS, et al., 2016. Development and application of coating thickness control system for cold rolling continuous galvanizing line. Iron Steel, 51(5): 57-61 (in Chinese). [5]Guelton N, Lerouge A, 2010. Coating weight control on ArcelorMittal’s galvanizing line at Florange Works. Contr Eng Pract, 18(10):1220-1229. [6]Guelton N, Lopès C, Sordini H, 2016. Cross coating weight control by electromagnetic strip stabilization at the continuous galvanizing line of ArcelorMittal Florange. Metall Mater Trans B, 47(4):2666-2680. [7]Jordan CE, Goggins KM, Benscoter AO, et al., 1993. Metallographic preparation technique for hot-dip galvanized and galvannealed coatings on steel. Mater Charact, 31(2):107-114. [8]Lu YZ, 1996. Industrial Intelligent Control: Fundamentals and Applications. Wiley, New York, USA. [9]Lu YZ, Markward SW, 1997. Development and application of an integrated neural system for an HDCL. IEEE Trans Neur Netw, 8(6):1328-1337. [10]Marder AR, 2000. The metallurgy of zinc-coated steel. Prog Mater Sci, 45(3):191-271. [11]Martínez-de-Pisón FJ, Pernía A, Jiménez-Macías EB, et al., 2010. Overall model of the dynamic behaviour of the steel strip in an annealing heating furnace on a hot-dip galvanizing line. Rev Metal, 46(5):405-420. [12]Martínez-de-Pisón FJ, Celorrio L, Pérez-de-la-Parte M, et al., 2011. Optimising annealing process on hot dip galvanising line based on robust predictive models adjusted with genetic algorithms. Iron Steel, 38(3):218-228. [13]Pal D, Datta A, Sahay SS, 2006. An efficient model for batch annealing using a neural network. Mater Manuf Process, 21(5):567-572. [14]Sanz-García A, Fernández-Ceniceros J, Fernández-Martínez R, et al., 2012. Methodology based on genetic optimisation to develop overall parsimony models for predicting temperature settings on annealing furnace. Iron Steel, 41(2):87-98. [15]Shin KT, Park HD, Chung WK, 2006. Synthesis method for the modelling and robust control of coating weight at galvanizing process. ISIJ Int, 46(10):1442-1451. [16]Thornton JA, Graff HF, 1976. An analytical description of the jet finishing process for hot-dip metallic coatings on strip. Metall Trans B, 7(4):607-618. [17]Tu CV, Wood DH, 1996. Wall pressure and shear stress measurements beneath an impinging jet. Exp Therm Fluid Sci, 13(4):364-373. [18]Warwick K, Rees D, 1988. Industrial Digital Control Systems. IET, London, England. [19]Yu W, Li XO, 2008. Optimization of crude oil blending with neural networks and bias-update scheme. Eng Intell Syst, 16(1):28-37. [20]Zhang Y, Shao FQ, Wang JS, et al., 2011. Adaptive control of coating weight for continuous hot-dip galvanizing. J Northeast Univ (Nat Sci), 32(11):1525-1528 (in Chinese). Journal of Zhejiang University-SCIENCE, 38 Zheda Road, Hangzhou
310027, China
Tel: +86-571-87952783; E-mail: cjzhang@zju.edu.cn Copyright © 2000 - 2024 Journal of Zhejiang University-SCIENCE |
Open peer comments: Debate/Discuss/Question/Opinion
<1>