[1]Chen, R.P. and Chen, Y.M., 2000. Theoretical Study on Effect of Pile Shaft Resistance on Rebound During Pile Driving. Proceedings of the 6th International Conference on the Application of Stress-wave Theory to Piles, Brazil, p.29-34.
[2]Chen, R.P., Chen, Y.M., Li, Q.and Tong, J.G., 2001a.Study of pile drivability with in-situ measurement.Chinese Journal of Geotechnical Engineering, 23(2): 235-238 (in Chinese).
[3]Chen, R.P., Hu, Y.Y.and Chen, Y.M., 2001b.Determine driving resistance with rebound of pile-top during pile driving.Journal of Zhejiang University SCIENCE, 2(2): 179-185.
[4]Chen, Y.M., Chen, R.P., Wu, S.M.and Van Weele, A.F., 1997.Determing static resistance of pile toe during driving with acceleration of pile top.Chinese Journal of Geotechnical Engineering, 19(6): 16-21 (in Chinese).
[5]Clough and Penzien, 1975.Dynamics of Structures.McGram-Hill, Inc., New York.
[6]Goble, G.G., 2000.Some Wave Mechanics Applications, Proceedings of the 6th International Conference on the Application of Stress-wave Theory to Piles, Brazil, p.3-9.
[7]de Albuquerque, P.J.R.and de Carvalho, D., 2000.Dynamic Load Test and Elastic Rebound Analysis for Estimation of the Bearing Capacity of Piles in Residual Soil.Proceedings of the 6th International Conference on the Application of Stress-wave Theory to Piles, Brazil, p.677-681.
[8]Lucieer, W.J., 2000.Rules of Thumb for Field and Construction Engineer in Relation to Impact.Proceedings of the 6th International Conference on the Application of Stress-wave Theory to Piles, Brazil, p.65-74.
[9]Rausche, F., Moses F., Goble G.G., 1972.Soil resistance predication from pile dynamics.Journal of the Soil Mechanics and Foundations Division, ASCE, 98(SM9):917-937.
[10]Rausche, F., Goble, G.G.and Likins, G.E., 1985.Dynamic determination of pile capacity.J.of Geotechnical Engineering, ASCE, 111(3): 367-383.
[11]Rausche, F., 2000.Pile Driving Equipment: Capacities and Properties.Proceedings of the 6th International Conference on the Application of Stress-wave Theory to Piles, Brazil, p.75-89.
[12]Smith, E.A.L., 1960. Pile driving analysis by the wave equation.J.Soil Mech.& Found.Eng.Div.ASCE, 86(4): 35-61.
[13]Uto, K., Fuyuki, M.and Omor, H., 1992.New Development of Pile Driving Management System.Proceedings of the 4th International Conference on the Application of Stress-wave Theory to Piles.the Hague, p.351-356.
[14]Weele, A.F.and Schellingerhout, A.F.G., 1994.Efficient Driving of Precast Concrete Piles.Proc.Conf.Development in Geotech.Eng.Bangkok, p.1-8.
Open peer comments: Debate/Discuss/Question/Opinion
<1>
Naol@hgdgasghd<tadetaye@yahoo.com>
2011-10-14 14:52:54
Thanks for your help.
tikaram<tikaram38@yahoo.co.in>
2010-11-20 01:03:11
dawson constrution plant hydraulic hammer piling hph 9000 serial no 9017 m/f date 1/2002