Rongrit Chatthaworn, Surachai Chaitusaney. An approach for evaluating the impact of an intermittent renewable energy source on transmission expansion planning[J]. Frontiers of Information Technology & Electronic Engineering,in press.https://doi.org/10.1631/FITEE.1500049 @article{title="An approach for evaluating the impact of an intermittent renewable energy source on transmission expansion planning", %0 Journal Article TY - JOUR
Abstract: This paper proposes a new optimization approach to evaluating the impact of intermittent renewable energy source on transmission expansion planning (TEP). The results show that the proposed optimization approach can provide a solution which is more robust that the other works and that the impact of intermittent renewable energy source on TEP needs to be appropriately considered.
一种评估间歇式可再生能源对输电网扩展规划影响的方法创新点:TEP的目标函数由传输线的投资成本和常规发电机的运行成本组成。为对所有的运行场景都获取稳健的扩展规划,提出一种选择恰当“代表间断性可再生能源的生产和负载”运行场景的方法。 方法:在所提出的TEP中,使用自适应禁忌算法(ATS,一种元启发式算法)。ATS在主问题(最小化投资和运营成本)和子问题(最小化常规电机电能生产成本,缩减可再生能源的生产和负载)间相互迭代。其中子问题由基于内点方法的非线性规划求解。此外,通过在考虑或不考虑可再生能源的条件下对比扩展规划,进一步评估间歇式可再生能源对TEP的影响。 结论:使用IEEE Reliability Test System 79(RTS79)测试所述方法,并评估间歇式可再生能源对TEP的影响。结果显示,相较其他方法本文所述最优化方法能够给出更为稳健的结果;而且,间歇式可再生能源对TEP的影响是应当纳入考虑范围的。 关键词组: Darkslateblue:Affiliate; Royal Blue:Author; Turquoise:Article
Reference[1]Akbari, T., Heidarization, M., Siab, M.S., et al., 2012. Towards integrated planning: simultaneous transmission and substation expansion planning. Electr. Power Syst. Res., 86:131-139. ![]() [2]Alizadeh, B., Dehghan, S., Amjady, N., et al., 2013. Robust transmission system expansion considering planning uncertainties. IET Gener. Transm. Distrib., 7(11):1318-1331. ![]() [3]Asadamongkol, S., Eua-Arporn, B., 2010. Benders Decomposition Based Method for Multistage Transmission Expansion Planning with Security Constraints. PhD Thesis, Department of Electrical Engineering, Chulalongkorn University, Bangkok. ![]() [4]Bahiense, L., Oliveira, G.C., Pereira, M., et al., 2001. A mixed integer disjunctive model for transmission network expansion. IEEE Trans. Power Syst., 16(3):560-565. ![]() [5]Bent, R., Berscheid, A., Loren Toole, G., 2011. Generation and transmission expansion planning for renewable energy integration. Power Systems Computation Conf. ![]() [6]Bertsimas, D., Litvinov, E., Sun, X.A., et al., 2013. Adaptive robust optimization for the security constrained unit commitment problem. IEEE Trans. Power Syst., 28(1):52-63. ![]() [7]Cebeci, M.E., Eren, S., Tor, O.B., et al., 2011. Transmission and substation expansion planning using mixed integer programming. North American Power Symp., p.1-5. ![]() [8]Chanda, R.S., Bhattacharjee, P.K., 1994. Application of computer software in transmission expansion planning using variable load structure. Electr. Power Syst. Res., 31(1):13-20. ![]() [9]da Silva, E.L., Ortiz, J.M.A., Oliviera, G.C., et al., 2001. Transmission network expansion planning under a tabu search approach. IEEE Trans. Power Syst., 16(1):62-68. ![]() [10]Department of Alternative Energy Development and Efficiency (DEDE), 2012. Alternative Energy Development Plan: AEDP 2012–2021. Ministry of Energy, Thailand. ![]() [11]Dusonchet, Y.P., El-Abiad, A.H., 1973. Transmission planning using discrete dynamic optimization. IEEE Trans. Power Appar. Syst., PAS-92(4):1358-1371. ![]() [12]Ekwue, A.O., Cory, B.J., 1984. Transmission system expansion planning by interactive methods. IEEE Trans. Power Appl. Syst., PAS-103(7):1583-1591. ![]() [13]Escobar, A.H., Gallego, R.A., Romero, R., 2004. Multistage and coordinated planning of the expansion of transmission systems. IEEE Trans. Power Syst., 19(2):735-744. ![]() [14]Fuchs, I., Völler, S., Gjengedal, T., 2011. Improved method for integrating renewable energy sources into the power system of northern Europe: transmission expansion planning for wind power integration. 10th Int. Conf. on Environment and Electrical Engineering, p.1-4. ![]() [15]Grainger, J., William, S.J., 1994. Power System Analysis. McGraw Hill, Singapore. ![]() [16]Hajimiragha, A.H., Cañizares, C.A., Fowler, M.W., et al., 2011. A robust optimization approach for planning the transition to plug-in hybrid electric vehicles. IEEE Trans. Power Syst., 26(4):2264-2274. ![]() [17]Jabr, R.A., 2013. Robust transmission network expansion planning with uncertain renewable generation and loads. IEEE Trans. Power Syst., 28(4):4558-4567. ![]() [18]Katdee, A., 2010. Tabu Searching. Rangsit University, Thailand. ![]() [19]Khatib, H., 2003. Economic Evaluation of Projects in the Electricity Supply Industry. The Institution of Engineering and Technology, London, England. ![]() [20]Latorre, G., Cruz, R.D., Areiza, J.M., et al., 2003. Classification of publications and models on transmission expansion planning. IEEE Trans. Power Syst., 18(2):938-946. ![]() [21]Leite da Silva, A.M., Fonseca Manso, L.A., de Sousa Sales, W., et al., 2012. Chronological power flow for planning transmission systems considering intermittent sources. IEEE Trans. Power Syst., 27(4):2314-2322. ![]() [22]Monticelli, A., Santos, A.Jr., Pereira, M.V.F., et al., 1982. Interactive transmission network planning using a least-effort criterion. IEEE Trans. Power Appar. Syst., PAS-101(10):3919-3925. ![]() [23]Mori, H., Sone, Y., 2001. A parallel tabu search based approach to transmission network expansion planning. IEEE Porto Power Tech Conf. ![]() [24]Muñoz, C., Sauma, E., Contreras, J., et al., 2012. Impact of high wind power penetration on transmission network expansion planning. IET Gener. Transm. Distrib., 6(12):1281-1291. ![]() [25]Rezaee Jordehi, A., 2014a. A chaotic-based big bang–big crunch algorithm for solving global optimization problems. Neur. Comput. Appl., 25(6):1329-1335. ![]() [26]Rezaee Jordehi, A., 2014b. Optimal setting of TCSCs in power systems using teaching-learning-based optimisation algorithm. Neur. Comput. Appl., 26(5):1249-1256. ![]() [27]Rezaee Jordehi, A., 2015a. Brainstorm optimisation algorithm (BSOA): an efficient algorithm for finding optimal location and setting of FACTS devices in electric power. Int. J. Electr. Power Energy Syst., 69:48-57. ![]() [28]Rezaee Jordehi, A., 2015b. Chaotic bat swarm optimisation (CBSO). Appl. Soft Comput., 26:523-530. ![]() [29]Rezaee Jordehi, A., 2015c. Enhanced leader PSO (ELPSO): a new algorithm for allocating distributed TCSC’s in power systems. Int. J. Electr. Power Energy Syst., 64:771-784. ![]() [30]Rezaee Jordehi, A., 2015d. Enhanced leader PSO (ELPSO): a new PSO variant for solving global optimisation problems. Appl. Soft Comput., 26:401-417. ![]() [31]Rider, M.J., Garcia, A.V., Romero, R., 2007. Power system transmission network expansion planning using AC model. IET Gener. Transm. Distrib., 1(5):731-742. ![]() [32]Romero, R., Gallego, R.A., Monticelli, A., 1996. Transmission system expansion planning by simulated annealing. IEEE Trans. Power Syst., 11(1):364-369. ![]() [33]Sarić, A.T., Stanković, A.M., 2009. A robust algorithm for volt/var control. IEEE Power Systems Conf. and Exposition, p.1-8. ![]() [34]Sepasian, M.S., Seifi, H., Foroud, A.A., et al., 2006. A new approach for substation expansion planning. IEEE Trans. Power Syst., 21(2):997-1004. ![]() [35]Stoll, H.G., 1989. Least-Cost Electric Utility Planning. John Wiley & Sons, New York, United States. ![]() [36]Sullivan, W.G., Wicks, E.M., Luxhoj, J.T., 2003. Engineering Economy. Pearson Education, New Jersey, USA. ![]() [37]University of York, 2004. Orthogonal Arrays (Taguchi Designs). Available from http://www.york.ac.uk/depts/maths/tables/orthogonal.htm [Accessed on June 20, 2014]. ![]() [38]Youssef, H.K., Hackam, R., 1989. New transmission planning model. IEEE Trans. Power Syst., 4(1):9-18. ![]() [39]Yu, H., Rosehart, W.D., 2012. An optimal power flow algorithm to achieve robust operation considering load and renewable generation uncertainties. IEEE Trans. Power Syst., 27(4):1808-1817. ![]() [40]Yu, H., Chung, C.Y., Wong, K.P., et al., 2009. A chance constrained transmission network expansion planning method with consideration of load and wind farm uncertainties. IEEE Trans. Power Syst., 24(3):1568-1576. ![]() [41]Yu, H., Chung, C.Y., Wong, K.P., 2011. Robust transmission network expansion planning method with Taguchi’s orthogonal array testing. IEEE Trans. Power Syst., 26(3):1573-1580. ![]() [42]Zahedi, A., 2012. Performance evaluation of wind turbine using Monte Carlo method and turbine power curve. Int. Power and Energy Conf., p.161-165. ![]() Journal of Zhejiang University-SCIENCE, 38 Zheda Road, Hangzhou
310027, China
Tel: +86-571-87952783; E-mail: cjzhang@zju.edu.cn Copyright © 2000 - 2026 Journal of Zhejiang University-SCIENCE | ||||||||||||||


ORCID:
Open peer comments: Debate/Discuss/Question/Opinion
<1>