
CLC number: TH166; TP278
On-line Access: 2024-08-27
Received: 2023-10-17
Revision Accepted: 2024-05-08
Crosschecked: 2019-07-03
Cited: 0
Clicked: 9399
Hai-yan Wang, Fu Zhao, Hui-min Gao, John W. Sutherland. A three-stage method with efficient calculation for lot streaming flow-shop scheduling[J]. Frontiers of Information Technology & Electronic Engineering,in press.https://doi.org/10.1631/FITEE.1700457 @article{title="A three-stage method with efficient calculation for lot streaming flow-shop scheduling", %0 Journal Article TY - JOUR
一种流水车间批量调度的高效计算三阶段优化方法关键词组: Darkslateblue:Affiliate; Royal Blue:Author; Turquoise:Article
Reference[1]Baker KR, 1995. Lot streaming in the two-machine flow shop with setup times. Ann Oper Res, 57(1):1-11. ![]() [2]Biskup D, Feldmann M, 2006. Lot streaming with variable sublots: an integer programming formulation. J Oper Res Soc, 57(3):296-303. ![]() [3]Chakaravarthy GV, Marimuthu S, Sait AN, 2013. Performance evaluation of proposed differential evolution and particle swarm optimization algorithms for scheduling m-machine flow shops with lot streaming. J Intell Manuf, 24(1):175-191. ![]() [4]Chakaravarthy GV, Marimuthu S, Ponnambalam SG, et al., 2014. Improved sheep flock heredity algorithm and artificial bee colony algorithm for scheduling m-machine flow shops lot streaming with equal size sub-lot problems. Int J Prod Res, 52(5):1509-1527. ![]() [5]Cheng M, Mukherjee NJ, Sarin SC, 2013. A review of lot streaming. Int J Prod Res, 51(23-24):7023-7046. ![]() [6]Davendra D, Senkerik R, Zelinka I, et al., 2014. Utilising the chaos-induced discrete self organising migrating algorithm to solve the lot-streaming flowshop scheduling problem with setup time. Soft Comput, 18(4):669-681. ![]() [7]Defersha FM, Chen MY, 2010. A hybrid genetic algorithm for flowshop lot streaming with setups and variable sublots. Int J Prod Res, 48(6):1705-1726. ![]() [8]Defersha FM, Chen MY, 2011. A genetic algorithm for one-job m-machine flowshop lot streaming with variable sublots. Int J Oper Res, 10(4):458-468. ![]() [9]Han YY, Gong DW, Jin YC, et al., 2016. Evolutionary multi-objective blocking lot-streaming flow shop scheduling with interval processing time. Appl Soft Comput, 42:229-245. ![]() [10]Kim K, Jeong IJ, 2009. Flow shop scheduling with no-wait flexible lot streaming using an adaptive genetic algorithm. Int J Adv Manuf Technol, 44(11-12):1181-1190. ![]() [11]Kumar S, Bagchi TP, Sriskandarajah C, 2000. Lot streaming and scheduling heuristics for m-machine no-wait flowshops. Comput Ind Eng, 38(1):149-172. ![]() [12]Liu JY, 2008. Single-job lot streaming in m-1 two-stage hybrid flowshops. Eur J Oper Res, 187(3):1171-1183. ![]() [13]Liu SC, 2003. A heuristic method for discrete lot streaming with variable sublots in a flow shop. Int J Adv Manuf Technol, 22(9-10):662-668. ![]() [14]Marimuthu S, Ponnambalam SG, Jawahar N, 2008. Evolutionary algorithms for scheduling m-machine flow shop with lot streaming. Robot Comput Integr Manuf, 24(1): 125-139. ![]() [15]Marimuthu S, Ponnambalam SG, Jawahar N, 2009. Threshold accepting and ant-colony optimization algorithms for scheduling m-machine flow shops with lot streaming. J Mater Process Technol, 209(2):1026-1041. ![]() [16]Martin CH, 2009. A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming. Omega, 37(1): 126-137. ![]() [17]Mukherjee NJ, Sarin SC, Singh S, 2017. Lot streaming in the presence of learning in sublot-attached setup times and processing times. Int J Prod Res, 55(6):1623-1639. ![]() [18]Nejati M, Mahdavi I, Hassanzadeh R, et al., 2014. Multi-job lot streaming to minimize the weighted completion time in a hybrid flow shop scheduling problem with work shift constraint. Int J Adv Manuf Technol, 70(1-4):501-514. ![]() [19]Nejati M, Mahdavi I, Hassanzadeh R, et al., 2016. Lot streaming in a two-stage assembly hybrid flow shop scheduling problem with a work shift constraint. J Ind Prod Eng, 33(7):459-471. ![]() [20]Onwubolu G, Davendra D, 2006. Scheduling flow shops using differential evolution algorithm. Eur J Oper Res, 171(2): 674-692. ![]() [21]Pan QK, Suganthan PN, Liang JJ, et al., 2011. A local-best harmony search algorithm with dynamic sub-harmony memories for lot-streaming flow shop scheduling problem. Expert Syst Appl, 38(4):3252-3259. ![]() [22]Reiter S, 1966. A system for managing job-shop production. J Bus, 39(3):371-393. ![]() [23]Sarin SC, Kalir AA, Chen M, 2008. A single-lot, unified cost-based flow shop lot-streaming problem. Int J Prod Econ, 113(1):413-424. ![]() [24]Storn R, Price K, 1997. Differential evolution—a simple and efficient adaptive scheme for global optimization over continuous spaces. J Glob Optim, 11(4):341-359. ![]() [25]Tasgetiren MF, Pan QK, Suganthan PN, et al., 2013. A variable iterated greedy algorithm with differential evolution for the no-idle permutation flowshop scheduling problem. Comput Oper Res, 40(7):1729-1743. ![]() [26]Tseng CT, Liao CJ, 2008. A discrete particle swarm optimization for lot-streaming flowshop scheduling problem. Eur J Oper Res, 191(2):360-373. ![]() [27]Ventura JA, Yoon SH, 2013. A new genetic algorithm for lot-streaming flow shop scheduling with limited capacity buffers. J Intell Manuf, 24(6):1185-1196. ![]() [28]Wang L, Pan QK, Suganthan PN, et al., 2010. A novel hybrid discrete differential evolution algorithm for blocking flow shop scheduling problems. Comput Oper Res, 37(3):509-520. ![]() Journal of Zhejiang University-SCIENCE, 38 Zheda Road, Hangzhou
310027, China
Tel: +86-571-87952783; E-mail: cjzhang@zju.edu.cn Copyright © 2000 - 2026 Journal of Zhejiang University-SCIENCE | ||||||||||||||


ORCID:
Open peer comments: Debate/Discuss/Question/Opinion
<1>